Rucúe hydroelectric power plant, located in the Antuco district, Biobío Region, was our first plant in the Laja River Basin.


Commissioning year:

1998

Installed capacity:

178,4 MW

Equivalent consumption:

Approximately 430 thousand people or 150 thousand households

RUCÚE