Installed capacity of up to 360 MW
An estimated annual generation of 800 GWh which will be injected into the National Electric System.
Current status: The project is currently undergoing evaluation within the Environmental Impact Assessment System (SEIA).
48 wind turbines with a power of up to 7.5 MW each