The San Juan Wind Farm is located in the commune of Canela, in the Atacama Region. It was acquired by our Company in 2024.


Commissioning year:

2017

Installed capacity:

193 MW
  (56 wind turbines of
3.45 MW each)

Annual generation:

487 GWh

SAN JUAN PARK