Juncalito hydroelectric power plant, located in the Los Andes district, Valparaíso Region, maximizes the use of the Juncal River waters and the Hornitos power plant generation.


Commissioning year:

1994

Installed capacity:

1,5 MW

Equivalent consumption:

Approximately 2,000 people or 700 households

JUNCALITO