Juncal hydroelectric power plant, located in the east of the Los Andes district, Valparaíso Region, maximizes the use of the Juncal River waters by means of an automated turbine, with a high drop height and low flow rate.
Commissioning year:
1994
Installed capacity:
29,2 MW
Equivalent consumption:
Approximately 49 thousand people or 17 thousand households