Chiburgo run-of-the-river hydroelectric power plant, located in the Colbún district, operates in keeping with the need for irrigation water in the area where it operates.
Commissioning year:
2007
Installed capacity:
19,4 MW
Equivalent consumption:
Approximately 35 thousand people or 12 thousand households.